This document provides the Field Trials Plan for the INFRA System. The exercise on the field is the mean to check if technical requirements derived from the end users functional requirements collected during INFRA WP1 are met, and the development of the system has been conducted in the right way. For that reason, an appropriate exercise will be designed containing as many details as possible, given throughout the present document.