D4.3.Integration Summary Report
All INFRA applications worked well over the ad-hoc setup communications infrastructure. Overall, all scheduled tests were conducted successfully and without major problems despite the fact that testing was performed under very difficult simulated conditions. D4.3.Integration Summary Report
D4.3.Integration Summary Report
D4.2.Field trial prototype system
This document shall describe the actual prototypes which will be used in the field trial. It should be noted that these prototypes were demonstrated in the final session of the Integration, held in Limerick Ireland, in October, 2010. D.4.2.Field trial prototype system
D4.2.Field trial prototype system
D4.5 Information Merging, Visualization and Bidirectional Communication at Command Post
Deliverable D4.5 presents the INFRA introduced advanced Command and Control Application handled by Command Post personnel in order to enable enhanced real-time situational awareness and media-rich errorfree communication and alerting with FR teams at the critical infrastructure during the management of an emergency (real-time subsystem) and effective administration of all necessary information and resources (FR [...]
D4.5 Information Merging, Visualization and Bidirectional Communication at Command Post