D 6.3 Exploitation model
The objective of this document is to design the most appropriate Business Model for an effective commercialization of the INFRA solution. D 6.3 Exploitation model (1) D 6.3 Exploitation model (2) D 6.3 Exploitation model (3)
The objective of this document is to design the most appropriate Business Model for an effective commercialization of the INFRA solution. D 6.3 Exploitation model (1) D 6.3 Exploitation model (2) D 6.3 Exploitation model (3)
The D5.2 document describes the obtained results from INFRA field trials and their assessment. Every trial is described and the results are presented. D5.2 Field trials results report
This document provides the Field Trials Plan for the INFRA System. The exercise on the field is the mean to check if technical requirements derived from the end users functional requirements collected during INFRA WP1 are met, and the development of the system has been conducted in the right way. For that reason, an appropriate [...]
This document has been produced to detail the CI Broadband Network Prototype. The CI Broadband Network Prototype is designed to allow rapid communication among FRs. D.2.2.CI Broadband Network prototypes